Park Terraces is nearing its culmination with all three towers simultaneously undergoing construction.

Structural works in Park Terraces Tower One is over 68% complete with installation of doors, windows, tiles and painting of interior and exterior walls happening at different floors.

Ongoing works at Point Tower include installation of concrete walls at the 22nd level and laying of concrete slab at the 25th level.

Building of the core wall at the ground floor of Park Terraces Tower Two is ongoing  while stairs from basement 2 to basement 1 are also being constructed.