LRT-1 operator LRMC breaks ground for the pre-construction work on the LRT-1 Cavite Extension to connect the exsiting line with 20 passenger stations.The 11.7 kilometer rail extension will have 8 passenger stations to be located in Parañaque, Las Piñas, and Cavite.

“It will serve an additional 300,000 commuters and will reduce travel time from Bacoor, Cavite to Manila from about two hours to about 40 minutes,” LRMC President and CEO Rogelio Singson said. LRMC is a joint venture company of MPIC’s Metro Pacific Light Rail Corporation, Ayala Corporation’s AC Infra and MIHPL.

Screen Shot 2017-05-06 at 12.01.52 PM