Seda Lio Hotel NEWS

Leave a comment

Ayala unit opens resort in El Nido

Seda Hotels, the homegrown hotel chain of AyalaLand Hotel and Resorts group, opened its first resort called Seda Lio within the 325-hectare Lio Tourism Estate in El Nido, Palawan.

Seda Hotels said in a statement Seda Lio is a 153-room beachfront hotel property that offers a complete range of facilities and amenities catering to leisure tourists, families, destination weddings, meeting and incentive groups.

Seda Lio, located only a few minutes from the airport, expands the current accommodation options in El Nido consisting of luxury resorts on the adjacent islands and bed-and-breakfast types in the town.

Read more:

http://manilastandard.net/business/transport-tourism/276231/ayala-unit-opens-resort-in-el-nido.html

 

 

3BR Canopy Pool Villa

Leave a comment

Unit 16E
Arbor Lanes (Jade Bldg)
Canopy Pool Villa (3BR Penthouse unit w Pool & Balcony)
Bi-Level
Size 260sqm (exclusive of balcony/pool area)
W 2 Parking Slots

Screen Shot 2018-09-06 at 2.37.21 PMScreen Shot 2018-09-06 at 2.38.01 PMScreen Shot 2018-09-06 at 2.35.13 PMScreen Shot 2018-09-06 at 12.30.34 PM

Screen Shot 2018-09-06 at 2.50.35 PMScreen Shot 2018-09-06 at 2.53.13 PMScreen Shot 2018-09-06 at 2.53.25 PMScreen Shot 2018-09-06 at 2.49.59 PM

Screen Shot 2018-09-24 at 12.04.02 PMScreen Shot 2018-09-24 at 12.06.38 PM.png

COCO MIDEL
M: +63.917.502.9252
E: coco.ayala@gmail.com
REBL 5279 / HLURB 000327

key tags arbor lanes arca south new BGC ayala land premier ayala land inc ayala land property arbor lanes block availability and prices contact person arbor lanes one union tower arca south avida alveo arca south verandas one union tower three bedroom garden suite best unit arca south hi end park cascades in arca south

Arbor Lanes Availability

Leave a comment

Screen Shot 2018-09-24 at 11.52.17 AMScreen Shot 2018-09-24 at 11.53.09 AM

COCO MIDEL
M: +63.917.502.9252
E: coco.ayala@gmail.com
REBL 5279 / HLURB 000327

key tags arbor lanes arca south new BGC ayala land premier ayala land inc ayala land property arbor lanes block availability and prices contact person arbor lanes one union tower arca south avida alveo arca south verandas one union tower three bedroom garden suite best unit arca south hi end

 

Alviera News

Leave a comment

How green is ALI’s valley

Alviera fleshes out its bold vision in Central Luzon

SOURCE: http://manilastandard.net/home-design/residential/275510/how-green-is-ali-s-valley.html
Ayala Land Inc. (ALI) recently announced that its marquee project Alviera—an ambitious mixed-use estate in Porac, Pampanga— is experiencing a 97% take-up for the first phase of its 1,800 hectares development, while land value has appreciated by 25%.
How green is ALI’s valley
Hub city. Alviera is being positioned as the future economic, lifestyle and leisure hub of Central Luzon.
In a press briefing this week, Alviera General Manager John Estacio pronounced satisfaction with the sprawling project’s progress and predicted that 250 hectares of the estate’s master plan will be activated by the end of 2018.
The former general manager of Nuvali, another ALI mixed-use development south of Philippines’ capital city,  pointed to the strong reception of the markets in Metro Manila and in Central Luzon for the brisk take-up of residential offerings in the estate.
He said Avida’s second development has been introduced, while Alveo Land and Ayala Land Premier’s is set to launch new residential offerings by the fourth quarter of 2018.
Expansion 
Alviera, in partnership with Leonio Holdings Inc., added 700-hectares to the development late last year and expanded to 1,800 hectares with its investment raised from P90 billion to P100 billion.
The 64-hectare Eco-Industrial Park at full development is expected to create 3,000 jobs. 41 industrial lots are sold and locators are expected to start operations by end of the year. Commercial lot sales have also started to bring in new investors with 25% sales take up. “We decided to expand because we are planning to contribute in the development of tourism in the country,” Estacio said.
“ALI made this investment to attract the top foreign leisure players from Europe, Asia, and North America to boost tourism in the Philippines,” he explained.
In anticipation of the potential boom of Central Luzon, ALI is developing Alviera as the catalyst that will boost the economic activities in the region by putting residential, business, tourism and leisure pursuits in one estate.
Estacio said Central Luzon is a logical choice as it has the third-largest GDP among the country’s regions and the second-largest population of higher-education graduates.
Meanwhile, the region’s tourism industry has a huge potential with over 3.6 million arrivals in 2015.
The government is embarking on several huge infrastructure projects, such as the North Luzon Expressway-South Luzon Expressway Connector Road, modernization and the expansion of the Clark Airport and the development of Clark-Manila high-speed railway.
Four districts
Positioned as a master-planned, integrated community, Alviera is comprised of several features now to be delineated by four districts—reflecting Alviera’s position of urban living in nature.
The Alviera East will be the hub of thriving industrial and commercial centers. Avida and Alveo will complement the development of the residential component, while Holy Angel University will handle the educational needs and employment through the Industrial Park and the Alviera East Commercial.
Local entrepreneurs, according to Estacio, gave a warm response with a rapid 95-percent sales take-up of the first phase of the Alviera Industrial Park with 16 industrial lots. He added the estate is expected to launch a second phase of the industrial park covering 32-has. It has signed locators in food manufacturing, motorcycle assembly, packaging and logistics, and warehousing. The non-PEZA industrial park was designed for light to medium, nonpolluting industries.

Cerilo Block 28 Lot 19

Leave a comment

CERILO
Block 28 Lot 19
850 sqm
P29,600/sqm

Screen Shot 2018-09-07 at 6.50.19 PMScreen Shot 2018-09-07 at 6.49.50 PM

TERMS

Screen Shot 2018-09-07 at 6.56.18 PM.png

HLURB LS NO 032242
Location: NUVALI, Barangay Canlubang, Calamba City, Laguna
Completion: September 2024
Turnover Date: Tranche 1 – Q3 2020 / Tranche 2 – Q4 2020
Project Developer: Ayala Land, Inc

COCO MIDEL
M: +63.917.502.9252
E: coco.ayala@gmail.com
REBL 5279 / HLURB 000327

KEY TAGS cerilo nuvali cerilo lots nuvali residential prices estimate lot sizes for sale nuvali lot ayala land premier cerilo new lot new inventory cerilo lot for sale best lot