Park Central Towers Building Artist Perspective 1

 

Project Name:             Park Central Towers

Land Area:                   15,860-sqm

Location:                     Makati Avenue corner Paseo de Roxas, Makati City

No. of Floors:             68

No of Units:                281

No. of Elevators:         8 passenger elevators + 1 passenger/service elevator

Parking:                       5 basement parking levels

Completion Date:       March 2025

Developer:                  Ayala Hotels Inc

 

Park Central Towers Bldg Artist Perspective 2Park Central Towers Makati SkylinePark Central Towers Location MapPark Central Towers Location Map 2Park Central Towers PoolPark Central Towers Retail PodiumPark Central Towers Retail CourtyardPark Central Towers Anadem Villa ThreePark Central Towers Sky TerracePark Central Towers Sky Terrace 2Park Central Towers Anadem Gourmet kitchenPark Central Towers Anadem Villa Entertaiment RoomPark Central Towers Anadem Villa Living and Dining RoomPark Central Towers Aquaview Master BedroomPark Central Towers Aquaview Villa Living and DiningPark Central Towers SKyview Villa Living and Dining RoomPark Central Towers Two Bedroom Gallery Living and Dining RoomPark Central Towers Unit Types 1Park Central Towers Unit Types 2Park Central Towers Unit Type 3

Shared Amenities:

• Fitness Center
• Pool
• Indoor multi-purpose court
• Indoor resident’s lounge
• Social hall
• Function rooms
• Boardrooms
• Indoor children’s play area
• Outdoor children’s play area
• Administration and engineering offices
• Driver’s lounge
• Car wash bay
• Storage
• Motorcourt

Individual Tower Amenities
• Four Sky Terraces (Fitness Center, Plunge pool, Resident’s lounge, Spa)
• Lobby with concierge, mailroom, and meeting lounge

Efficiency and Sustainability
• Efficiency features for common area lights and toilets
• Centralized garbage disposal system

Safety and Security
• Fire detection and alarm system for residential and tower area, retail, and basement parking
• 24-hour security and building maintenance
• Proximity card access for parking, elevators, and amenities
• 100% back-up power
• Integrated CCTV Security System in select common areas
• Motorcourt exclusive to residents and guests only at Lower Ground

Convenience and Services

• Separate and exclusive air-conditioned lobby at the Lower Ground
• Vertical Transport System (8 passenger elevators- 4 of 8 dedicated to select units; 1 passenger/service elevator)
• 5 basement parking levels
• Concierge Services
• Direct residential-only access to retail establishment on the 3rd level

Other Features:
• Retail, dining, service establishments, and dynamic workspaces at the podium level

Unit Types

Anadem Collection
No of units: 7
Size Range: 239 to 1,635 sqm

Aquaview Villas (Three or Four-Bedroom)
No. of units: 54
Size Range: 286 t0 422 sqm

Skyview Villas (Three or Four-Bedroom)
No. of units: 54
Size Range: 229 to 284 sqm

Gallery Villas (Two or Three –Bedroom)
No. of Units: 54
Size Range: 202 to 336 sqm

Glass Suites (Two or Three-bedroom)
No. of units: 112
Size Range: 138 to 241 sqm

PREMIER PARTNERS

ARCHITECT-OF-RECORD
Leandro V. Locsin and Partners

ENGINEER-OF-RECORD
Sy^2 + Associcates

ELECTRICAL CONSULTANT
Meralco Energy Inc.

MECHANICAL CONSULTANT
DCCD Engineering Corporation

SANITARY PLUMBING AND FIRE PROTECTION CONSULTANT
NBF Consulting Inc.

LIFT Consultant
Roy Barry & Associates

FACADE CONSULTANT
ALT Cladding, Inc

QUANTITY SURVEYOR
Arcadis

PROJECT MANAGEMENT
Bureau Veritas

GENERAL CONTRACTOR
Makati Development Corporation

PROPERTY MANAGEMENT
Ayala Property Management Corporation

DEVELOPER
Park Central Towers is a project of Ayala Hotels, Inc, a joint venture between Ayala Land, Inc and the Ayala Corporation, bringing the latest in premium residences and lifestyle destinations

TURNOVER
Residences turnover in 2024
Beginning January 2024 – First Tranche (5th to 21st Floor)
Beginning March 2024 – Second Tranche (22nd to 37th Floor)
Beginning May 2024 – Third Tranche (38th to 54th Floor)
Beginning July 2024 – Fourth Tranche (55th to 64th Floor)

TLS ENCRFO NO. 15-11-031

Project Location: Makati Avenue corner Paseo de Roxas, Makati City
Project Completion: March 2025
Project Developer: Ayala Hotels Inc

For more info:

COCO MIDEL
M: +63.917.502.9252
E: coco.ayala@gmail.com
REBL 5279 / HLURB 000327

key tags park central towers makati information sales ayala land ayala corporation philippines real estate condominium luxury hi-end ayala hotels